New 1 week (okay 1 month) Challenge

Back in the day when this blog was new I decided that I was going to make my office a sanctuary in one week and for only 20 dollars. Well, I’ve decided to take on a bigger challenge this time. Our old house had a really amazing kitchen and this house, well, the kitchen is the room that needs the most work. Mike was handy enough to get it functional within a couple weeks of us moving in but it still needs significant cosmetic work. My new goal is to fix up the kitchen in one month (okay, I had thought I could do it in 2 weeks but after a couple days of work with little progress I’ve decided to give myself a little more time) and not spend more than 150 dollars. It’ll mostly be a bit of elbow grease and A LOT of painting.

Here are some before pictures:

gedc0166

gedc0167

gedc0168

I also hope to do as much as I can on my own but I needed someone to help with some heavy lifting so I enlisted Mike’s help on the weekend and we moved the deep freeze to the spare bedroom in order to finally have a functional laundry room and pantry.

gedc01721

I couldn’t be more thrilled with the results. It even gave me room to unpack a few more boxes. Things are finally coming together and I think the results are going to spectacular!

Advertisements
This entry was posted in Around the House. Bookmark the permalink.

One Response to New 1 week (okay 1 month) Challenge

  1. Pingback: What we are up to…. « Mama Manuscripts

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s